MARTIN P. FOSTER
115 Jodie Drive
Huntsville, Alabama, 35811
1-256-776-8572
Email: foster225@msn.com
SUMMARY: Over twenty years experience in Construction, Design and Engineering in the Power Industry.
EDUCATION:
BSCE Drexel University 1976
Cornell University – Seismic Design
EIT 1978 State of Pennsylvania
EXPERIENCE:
Oct. 05 HKA Enterprises, Inc. (Parsons)
Jan. 06 Structural Engineer Management in support of Hurricane Katrina Recovery. for the INGALLS ship yard located in Pascagoula, MS.
Performed structural assessment for storm-damage to buildings and other structures. . Performed inspections and wrote scopes of damage for insurance companies, recommending refurbishments to buildings.
Aug. 05 B &W, Inc
Sept. 05 Principal Engineer
Performed haul-path and rigging study for the replacement of Pressurizer for Unit 2 ANO (Entergy) facility for pre-outage work.
Designed security safeguards. This included but not limited to security fences, gates, elevator security, razor wire, special shooting stations and bullet proof glass.
Assigned to the Ft. Calhoun Nuclear Station
Feb. 05 Principal Engineer
Responsible for Plant Modifications and rigging for
The support of refueling outage which included but not limited to the Torus corrosion, equipment rigging, outage emergencies and walk downs.
Assigned to Cooper Nuclear Station
To Dec. 04 Principal Engineer
Designed safeguards for Security. This included but was not limited to support design for security items such as guard protection in the event of terrorist attacks on the Nuclear Facility. Assigned to the Ft. Calhoun Nuclear Station.
Performed qualification of permanent lead shielding mounted on the Re-Circ piping.
Review of platforms and Flow Accelerated Corrosion Analysis for BFN U3. BFN U1 Restart. Seismic Equipment Qualification for such items as control panels, valves, electrical wall boxes, retaining walls, air handling units,, heat exchangers, tanks, piping and pipe mounted instruments.
Feb. 2001 ESG International, Inc.
To 11-2-01 Structural Engineer
Performed Pipe Stress Analysis for Power Up-rate.
Responsible Engineer for Replacement of Condenser Tubing. This included, but was not limited to the structural design temporary platform design of platforms, rigging of tube sheets and re-route of piping during the outage.
Assigned to Shearon Harris Nuclear Power Plant.
Steam Generator Replacement Project. Responsible for Engineering reviews for SGRP for Consolidated Edison.
Assigned to Indian Point II Nuclear Power Plant
May 2000 MESA ASSOCIATES INC.
Designed screw piles for transmission towers at Shelby Station, TN.
Worked closely with AB Chance and QORE Engineering.
Assigned to TVA Projects
Oct. 1998 RCM Technologies
To May 2000 Structural Engineer
Resolved Condition Reports performing operability determination and
Calculations for various structures and equipment, such as battery racks,
Tanks, air-handling units, cable tray and duct supports.
Assigned to the D.C. Cook Nuclear Plant
June 1997 PROTO POWER INC.
To June 98 Principal Engineer
Worked on the Hazards Review Program, pipe whip, high-energy line
Breaks, rotating machinery, missile effects, and flooding. Procedure
Writer for Hazards Review Program. Rigging engineering evaluations.
Assigned to Millstone, Nine Mile 2 and Fitzpatrick Nuclear Facilities.
May 1997 OEM, INC.
To June 97 Senior Engineer
Performed pre-outage work for Civil Engineering on such projects as
SSW pumps, Weir wall design, Crane repair, and Enclosure designs for
Blast cleaning of Turbine parts.
Assigned to the Grand Gulf Nuclear Facility.
Feb.1997 HEPCO INC.
To June 97 Structural Engineer
Performed Erosion-Corrosion review for steel liner plate in concrete
Containment. Performed analysis of vertical pumps, strainers and
Snubbers.
Assigned to J.A. Fitzpatrick Nuclear Facility
Oct. 1996 NUS-SCIENTECH, INC.
To Jan. 97 Senior Engineer
Performed Engineering Evaluations which included the re-writing of
ASME and piping insulation specifications.
Assigned to the Perry Nuclear Power Plant
Sept. 1995 APPLIED POWER ASSOCIATES INC.
To Dec. 95 Senior Structural Engineer
Performed equipment qualification and inspection of rigging and
Scaffolding for outage.
Assigned to the Cooper Power Plant
June 1993 VECTRA TECHNOLOGIES, INC
Performed SEQ. Coordinated with construction to incorporate design
Changes due to field modifications. Reviewed vendor documentation.
Assigned to Arkansas One.
June 1992 HALIBURTON-NUS, INC.
Performed seismic equipment qualification on control panels, instrument
And battery racks, chargers, plus direct replacement of valves and
Various instruments.
Assigned to Brunswick Nuclear Power Plant
Jan. 1991 TVA
Duties included the review of equipment.
Assigned to Watts Bar Nuclear Power Plant
May 1990 NUTECH ENGINEERING INC.
To Nov. 90 Consultant Engineer
Duties included design and analysis of equipment, such as valves, pipe lead
Shielding, and snubber reduction. Worked on specialized problems, such
As motors, diesel generators, pressure switches, and miscellaneous equip-ment.
Assigned to the Duane Arnold Energy Center
Feb. 1990 UNITED ENGINEERS
To April 90 Structural Engineer
Designed buildings, and conveyor systems supports for INCOTE Project
July 1989 TVA
to Jan. 90 Senior Engineer
Performed pipe support and SEQ.
Assigned to Browns Ferry Unit 2
Sept. 1988 NUTECH ENGINEERS, INC
To June 89 Principal Engineer
Performed commercial dedication of components. Performed platform
Redesign due to installation of new chillers, using the STADD III
Program. Assigned to the Susquehanna Power Plant
Sep. 1987 TVA
To Aug. 88 Mechanical Engineer
Performed SEQ of components, with application of ASME and other
Codes and methods.
Oct. 1980 UNITED ENGINEERS AND CONSTRUCTORS
To Sep. 87 Engineer II
Performed Pipe Stress Analysis Performed SEQ and vendor document review for several nuclear plants. Used ADELPIPE, Star-dyne, MADIS, and Water programs for analysis. Worked in the Mechanical Analysis Group.
March 1976 ANALYTICAL ENGINEERING ASSOCIATES
Performed engineering services for the design of control panels for
Nuclear Power Plants to meet with seismic requirements for (both static
And dynamic) Main Control Boards and other electrical panels. This work involved calculation of Structural responses, corresponding panel member stresses and peak Acceleration input to the mounted electrical components. Also per-Formed vibration testing on control panels and components at various Test laboratories. Performed work for Submarine Antenna Division of the Philadelphia Navy Yard. Used STAR-DYNE program.
1974 UNITED ENGINEERS AND CONSTRUCTORS
To 1975 Engineer IV/ Structural Designer
Worked as Structural Designer on the Seabrook Nuclear Power Plant.
Designed Underground electrical manholes, Intake Flume, Seawall,
Waste-Storage Building, and concrete missile-shield for storage tanks.
Performed Heat Transfer Analysis for the Mechanical Analysis Group using the Marc-Heat program.